Pelletizing converts iron-ore concentrate into the high-quality feedstock required by modern steelmaking. The new production site is spread across many buildings and process areas, each with its own electrical load centre.
To avoid long cable runs and on-site assembly, power distribution was solved with prefabricated E-house substations. Each module arrived tested and ready to connect, which compressed the installation schedule on a very large construction site.
One module per process area. Substations were placed beside the loads they feed, shortening low-voltage routes and reducing losses.
Factory tested. Switchgear, protection and auxiliary systems were assembled and tested in the workshop before shipping.
Scalable layout. Identical module concepts simplified spare-part planning and operator training across all 24 units.
Scope: Internal substations in E-house design, 10/0.4 kV – 24 units; ABB UniGear ZS1 medium-voltage switchgear, 10 kV; Low-voltage switchgear, 0.4 kV
A large-scale E-house programme that brought electrical infrastructure to a heavy-industry site in a single, repeatable engineering concept.