Twenty-eight substations for a grain terminal and biotechnology complex in the Kaluga region.
The project combines a grain terminal with a biotechnology complex on one site, also referred to as Biotech Rosva. Silos, process buildings and utility blocks are spread over a wide area.
To serve this layout, UNIGRON supplied medium-voltage UniGear ZS1 switchgear and low-voltage distribution for twenty-eight internal substations, forming a dense but clearly structured ring of power nodes around the site.
Internal substations 10/0.4 kV – 28 units
ABB UniGear ZS1 medium-voltage switchgear, 10 kV
Low-voltage switchgear, 0.4 kV
A distributed scheme keeps cables short and allows each building to be commissioned separately.